Featured Projects
Decking![Decking Project Decking Project](https://www.dunlaproofing.com/wp-content/uploads/2017/09/deck-1.jpg)
The final product – adding layers of coating to the surface to make the deck water tight
![Decking Project Before Decking Project Before](https://www.dunlaproofing.com/wp-content/uploads/2017/09/deck-3.jpg)
A deck with rot
![Decking Project in Process Decking Project in Process](https://www.dunlaproofing.com/wp-content/uploads/2017/09/deck-2.jpg)
Plywood installed after rot repair on a deck before applying coating
Decks are an animal of their own. It is very common for there to be a lot of rot to repair prior to anything else.
After rot repairs a layer of ¼” ACX plywood in glued and screwed down for a smooth surface to work with for the new coasting product.
Multiple layers of specialized coating are applied to make for a water tight and walkable surface. The final result is a waterproof deck that will be good for many years to come.
All Featured Projects
![Community First Credit Union](https://www.dunlaproofing.com/wp-content/uploads/2018/01/20180122_132559a.jpg)
![Wood Roofing](https://www.dunlaproofing.com/wp-content/uploads/2017/09/wood-roofing-1.jpg)
![Fort Bragg Town Hall](https://www.dunlaproofing.com/wp-content/uploads/2017/08/town-hall.jpg)
![Mendocino Coast Turrets](https://www.dunlaproofing.com/wp-content/uploads/2017/09/turret-1.jpg)
![Fort Bragg Starbucks](https://www.dunlaproofing.com/wp-content/uploads/2017/08/starbucks.jpg)
![Ann’s Place](https://www.dunlaproofing.com/wp-content/uploads/2017/09/anns-place-4.jpg)
![Laytonville Chevron](https://www.dunlaproofing.com/wp-content/uploads/2017/09/chevron-1.jpg)
![Insulation](https://www.dunlaproofing.com/wp-content/uploads/2017/09/insulation-2.jpg)
![Clearstory Windows](https://www.dunlaproofing.com/wp-content/uploads/2017/09/clearstory-2.jpg)
![Decking](https://www.dunlaproofing.com/wp-content/uploads/2017/09/deck-1.jpg)
![Marvin Gardens](https://www.dunlaproofing.com/wp-content/uploads/2017/09/marvin-gardens-1.jpg)