Marvin Gardens
Marvin Gardens Roof Fort Bragg Before

Marvin Gardens office

Marvin Gardens Roof Fort Bragg in Process

Ripped 2 x 6’s diagonally placed to create some drainage as the roofs there were nearly dead flat

Marvin Gardens Roof Completed

Marvin Gardens roof completed

For this job we are at the office of Marvin Gardens Apartments in Fort Bragg, CA. After re-roofing most of the buildings there though the last 10 years now it’s time for the office itself.

As with the rest of the roofs on site we started by installing ripped 2 x 6’s (diagonally) to create some drainage as the roofs there were nearly dead flat and held a lot of ponding water during the rains.

To further drainage we cut the roofing back at the drain locations to make the drains as low as possible to assist drainage. To install the plywood we start on the highest point and worked downhill making our cuts at the lower edges.

The Re-roofing continued with work around the skylight. In the critical drain locations we used new copper flashings and new galvanized flashings on the plumbing vents.

And the final matter was installing a new skylight. Not sure about Eric there on the left? Is he checking wind direction or ordering a cheeseburger?